Printed in U.S.A. REVISED 12/30/04
Instruction
No.
AERCO INTERNATIONAL, Inc., Northvale, New Jersey, 07647 USA
Installation, Operation
& Maintenance Instructions
KC Series
Gas Fired
Water Heating
System
Natural Gas or Propane Fired,
Condensing and Forced Draft Hot Water Heater
1,000,000 BTU/HR Input
Applicable to Serial Numbers G-01-026 and above
Patent No. 4,852,524
GF-105
Vue de la page 0
1 2 3 4 5 6 ... 83 84

Résumé du contenu

Page 1 - Water Heating

Printed in U.S.A. REVISED 12/30/04 Instruction No. AERCO INTERNATIONAL, Inc., Northvale, New Jersey, 07647 US

Page 2 - Telephone Support

INSTALLATION PROCEDURES5Figure 2.5Condensate Drain Assembly Location2.4 GAS SUPPLY PIPINGAERCO Gas Fired Equipment Gas Componentsand Supply Design Gu

Page 3 - CONTENTS

INSTALLATION PROCEDURES6not exceed 10.5” W.C. at any time when the unitis firing. Proper sizing of the gas supply regulatorin delivering the correct g

Page 4

INSTALLATION PROCEDURES7Figure 2.8Electrical Wiring Diagram2.6 FIELD CONTROL WIRINGEach unit is fully wired from the factory with aninternal operatin

Page 5 - Foreword

INSTALLATION PROCEDURES8of the equivalent length. For a natural draftinstallation the draft must not exceed - 0.25”W.C. These factors must be planned

Page 6 - SAFETY PRECAUTIONS

CONTROL PANEL OPERATING PROCEDURES9SECTION 3- CONTROL PANEL OPERATING PROCEDURESThe following is a guide to the operation of theunit’s control panel.

Page 7

CONTROL PANEL OPERATING PROCEDURES10The third LED, “ON”, indicates the status of thestart relay, (Fig. 3.2). The start relay is internal tothe control

Page 8

CONTROL PANEL OPERATING PROCEDURES11To access the percent of firing rate press theINDEX button while in the primary menu until(Pct) is displayed in th

Page 9

CONTROL PANEL OPERATING PROCEDURES12Figure 3.7Auto/Manual Display with Manual ON3.4 SECONDARY MENUThe secondary menu is primarily related totemperatu

Page 10 - INSTALLATION PROCEDURES

CONTROL PANEL OPERATING PROCEDURES13LCD display on the front of the control panel.They are labeled CLEAR, !, ", and AUX.The MAIN display is used

Page 11

CONTROL PANEL OPERATING PROCEDURES143.6 THE COMBUSTION SAFEGUARDCONTROLLERThe Combustion Safeguard is responsible formonitoring the safety components

Page 12

Telephone Support Direct to AERCO Technical Support (8 to 5 pm EST, Monday through Friday) (800) 526-0288 AERCO Int

Page 13

CONTROL PANEL OPERATING PROCEDURES153.9 START SEQUENCE When the unit is in the standby mode, and thereis a demand for hot water, the following will o

Page 14 - WARNING:

CONTROL PANEL OPERATING PROCEDURES16from the ignition transformer and the MAINLED lights of the combustion safeguard. At this point, the annunciator w

Page 15

INITIAL START-UP17SECTION 4 - INITIAL START UP4.1 INITIAL START- UP REQUIREMENTSThe Initial Start-Up of the KC-1000 Boiler iscomprised of the followi

Page 16

INITIAL START-UP181/4" NPT PLUG(INSTALLMANOMETERHERE)SSOVFigure 4.11/8” Gas Plug Location4.2.2 PREPARING THE FLUE VENTPROBE HOLE1. If the unit

Page 17

INITIAL START-UP193. Using the 16” manometer installed as perSection 4.2.1, adjust the gas supplyregulator until a reading of 12” W.C. staticpressure

Page 18 - MESSAGES

INITIAL START-UP20clockwise, 1/4-1/2 turns, to increase gasflow. 16. Wait for the analyzer reading to settle, thencompare the new reading to Table 1.

Page 19

INITIAL START-UP2126. Allow the analyzer to settle. Repeat theadjustment until the oxygen is within thespecified range. Firmly tighten the inlet airsh

Page 20 - CONNECTOR

INITIAL START-UP228. Replace the unit’s panels and hood.9. Remove the combustion analyzer probefrom the vent hole. Seal the probe hole andreplace th

Page 21

INITIAL START-UP234.6.3 MAXIMUM LOAD ADJUSTMENT1. Enter the SECONDARY menu of thetemperature controller by simultaneouslypressing ! and ENTER. 2. P

Page 22 - SECTION 4 - INITIAL START UP

INITIAL START-UP24200o F water temperature. Do NOT attempt toadjust it’s set point.To adjust the lower over temperature switch limitswitch:1. Remove

Page 23

CONTENTSi GF-105 THE AERCO KC1000 GAS FIRED DOMESTIC WATER HEATER Operating & Maintenance Instructions FOREWORDSection 1 SAFETY PRECAUTION

Page 24

SAFETY DEVICE TESTING25SECTION 5-SAFETY DEVICE TESTING PROCEDURES5.1 TESTING OF SAFETY DEVICESPeriodic testing of all controls and safety devicesis r

Page 25

SAFETY DEVICE TESTING269. Open the water shut-off valve in the supplypiping to the unit. 10. Press the LOW WATER LEVEL RESETbutton to reset the low w

Page 26

SAFETY DEVICE TESTING272. Disconnect wire #17 from the air pressureswitch located on the air/fuel valve (See Fig.5.4). 3. Restore AC power to the un

Page 27

SAFETY DEVICE TESTING2810. Restore AC power to the unit. 11. Start the unit.WARNING!THIS IS A 120 VOLT AC COMBUSTIONSAFEGUARD SYSTEM. POWER MUSTBE REM

Page 28

MAINTENANCE29SECTION 6 – MAINTENANCE6.1 MAINTENANCE SCHEDULEThe KC1000 requires regular routinemaintenance to keep up efficiency andreliability. For

Page 29

MAINTENANCE305 Prior to reinstalling the ignitor, an anti-seizecompound must be applied to the ignitorthreads. 6 Reinstall the ignitor using the ign

Page 30 - SAFETY DEVICE TESTING

MAINTENANCE316.7 BTU TRANSMITTER ASSEMBLYThe BTU Transmitter is a crucial part of theunit’s temperature control system. It must beinspected and kept

Page 31

MAINTENANCE3212. Loosen the compression fitting holding thehydraulic zero and control orifice tubeassembly to the pump’s impeller housing,(See Fig. 6.

Page 32

MAINTENANCE33Figure 6.9BTU Transmitter Shell ComponentsFigure 6.10Impeller Housing Disassembly21 Once the BTU transmitter has beeninspected and clean

Page 33

MAINTENANCE34Figure 6.11Grounding Terminal Location9. Loosen the hose clamp at the air/fuel valveoutlet and slide the clamp back towards theburner, (

Page 34 - SECTION 6 – MAINTENANCE

CONTENTSii2/27/99Section 6 MAINTENANCE REQUIREMENTS-------------------296.1 Maintenance Schedule6.2 Spark Ignitor6.3 Flame Detector6.4 Combustion Cali

Page 35

MAINTENANCE35Figure 6.15Air/Fuel Valve Inlet Hose Clamp16. Using an 11/16” wrench, loosen thecompression fittings on the feedback tubebetween the air/

Page 36

MAINTENANCE36122537). The use of Permatex or a similargasket adhesive is recommended.26. Replace the gasket between the manifoldand tubesheet (P/N GP-

Page 37

MAINTENANCE377. Place a shell head gasket on top of the shellring first, then place the release gasket ontop of the shell head gasket. Align thegaske

Page 38

MAINTENANCE38Figure 6.20Concave Style Head8. Place the shell gasket then the releasegasket on top of the shell ring and align thegasket holes with th

Page 39

TROUBLESHOOTING39SECTION 7- TROUBLESHOOTING GUIDEThis troubleshooting section is intended to serveas a guideline to determining and solving faultson t

Page 40

TROUBLESHOOTING405. Referring to system schematic 161412 inthe Appendix, locate and check continuity inwires #20 and #32 from the fifteen pinconnecto

Page 41

TROUBLESHOOTING415. If 12 VAC is read on the AC voltmeter,disconnect power to the unit and ground theprobe to the unit shell. 6. Restore electrical

Page 42

TROUBLESHOOTING427. Reset the unit and if necessary, the upperover-temperature limit switch. If the unit willnot reset proceed to section 7.4.2.7.4.2

Page 43

TROUBLESHOOTING4310. Place the entire length of the sensors in awater bath of known temperature. Measurethe resistance of the probe, and determinethe

Page 44 - TROUBLESHOOTING

TROUBLESHOOTING44 2. If the gas supply valves were open, restartthe unit. 3. Remove the cover to the Air Fuel Valve.Ensure that the Air Fuel Valve r

Page 45

FOREWORDiiiForewordThe AERCO KC Hot Water Heating System is a true industry advance that meets the needs oftoday’s energy and environmental concerns.

Page 46

TROUBLESHOOTING4520. Restore electrical power to the unit andrestart the unit. 21. If the safety shutoff valve still does not open,proceed to section

Page 47

TROUBLESHOOTING4621. If wires #12 and #29 have continuity, inspectthe pin on wire #12 in the 9-pin connector forproper insertion or signs of wear 22.

Page 48

TROUBLESHOOTING477.6 LOCKOUT RUN AIR FLOWA LOCKOUT RUN AIR FLOW indicates that theair pressure while running is too low foroperation. Oscillations or

Page 49

TROUBLESHOOTING487. Referring to system schematic 161412 inAppendix F, locate wire #17 and #24 andcheck both for continuity. 8. Check the switch end

Page 50

TROUBLESHOOTING497.7.3 AIR SUPPLY AND BLOWER PROOFSWITCH1. If the unit has sealed combustion, check theducting for any signs of blockage 2. If combu

Page 51

TROUBLESHOOTING5012. Reset the actuator onto the valve body whileobserving the ohm meter 13. If continuity is now okay, reconnect wires#21 and #22, re

Page 52

TROUBLESHOOTING51NOTE:Do not rotate the air/fuel valve with powerapplied to the unit.5. If the air/fuel valve does not rotate or isextremely difficul

Page 53

APPENDICES APPENDIX A Temperature Controller Menus APPENDIX B Temperature Controller Quick Programming Guide APPENDIX C Temperature Sensor

Page 55

APPENDIX AiPRIMARY MENU ITEM DESCRIPTIONStoutpctSetpAutoThis is the actual outlet watertemperature of the heater. It isdesignated by the code (tout).P

Page 56

SAFETY PRECAUTIONS1SECTION 1 -- SAFETY PRECAUTIONSInstalling or operating personnel MUST, atall times, observe all safety regulations.The following wa

Page 57 - APPENDICES

APPENDIX AiiSecondary Menu Item DescriptionFUNCtoutFFtPctSetP SEnSThis indicates the mode of operation thetemperature controller is in. Commonmodes ar

Page 58

APPENDIX AiiiOFStLLtHLtPb1intdrtThis is minimum load adjust used duringa water heater temperature calibration.It adjusts the controller’s linear offse

Page 59 - APPENDIX A

APPENDIX AivAddrloreTurns the outlet sensor feedback ON orOFF. Used during factory calibration ofthe BTU transmitter. Feedback shouldalways be in the

Page 60

APPENDIX BvTEMPERATURE CONTROLLER QUICK REFERENCEPROGRAMMING GUIDEThe following is a “How To” guide that quickly shows how to access menu levels andth

Page 61

APPENDIX BviNOTE: The temperature controller defaults back to the PRIMARY menu from the SECONDARYmenu or the SECURE menu if there is no activity in ei

Page 62

APPENDIX Bvii• SECURE MENU TO THE MAIN MENUWhile in the SECURE menu press INDEX and the ⇓ arrow key. This will place you in the SECONDARY menu. Press

Page 64 - APPENDIX B

APPENDIX D ix WATER HEATER DEFAULT SETTINGS MENU LEVEL & CODE DESCRIPTION OF CODE0 FACTORY DEFAULT PRIMARY MENU tout OUTLET TEMPERATURE ACTU

Page 65 - • CHANGING MENU ITEM VALUES

APPENDIX D x bp 7 bp_8 BREAK POINT 8 85 bp 8 bp_9 BREAK POINT 9 81 bp 9 bp_A BREAK POINT 79 bp A bp_B BREAK POINT 77 bp B

Page 67 - APPENDIX D

INSTALLATION PROCEDURES2SECTION 2 - INSTALLATION PROCEDURES2.1 RECEIVING THE UNITEach KC unit is shipped as a single crated unit.The shipping weight

Page 68

APPENDIX E xii 18(45.7)49(124.5)57(144.8)16-3/422-5/871-7/871-7/819(48)15-1/2(39.4)6(15.2) I.D.FLUE CONN.3/4(1.9) DIA.(ENCLOSURE)PRESS./TEMP.RELIEF2

Page 69 - APPENDIX E

APPENDIX E xiii

Page 70

APPENDIX E xiv

Page 71

APPENDIX F xv

Page 72

APPENDIX F xvi

Page 73 - APPENDIX F

APPENDIX F xvii

Page 74

APPENDIX F xviii

Page 75

APPENDIX F xix

Page 76

APPENDIX F xx FLOORFLOOR

Page 77

APPENDIX G xxi

Page 78

INSTALLATION PROCEDURES32.3 INSTALLATIONThe unit must be installed with the prescribedclearances for service as shown in Fig 2.1These are the minimum

Page 79 - APPENDIX G

APPENDIX G xxii

Page 80

APPENDIX H xxiii 13 123446 FAN GUARD 12 123402 #6-32 X 3/8 LG PAN HEAD MACH. SCREW 11 123459 #6-32 X 2 LG PAN HEAD MACH. SCREW 10 123452 #8

Page 81 - APPENDIX H

APPENDIX H xxiv 18 123280-W1 WATER HEATER TEMPERATURE CONTROLLER 17 123803 SOLID STATE TIMER-ARTISAN CORP(123469 FOR SSAC INC.) 16 123438 C

Page 83

HEAT EXCHANGERS • WATER HEATERS • BOILERSHEAT RECLAMATION SYSTEMS • CONTROL VALVES STEAM GENERATORSHOT WATER SYSTEMSAERCO INTERNATIONAL, INC. • 159 P

Page 84

INSTALLATION PROCEDURES4for startup and testing. It should be a minimumof 3/4". It cannot be omitted (See Fig. 2.4a)Figure 2.4aHose Bibb Location