Aerco Modulex 606 Manuel de service

Naviguer en ligne ou télécharger Manuel de service pour Chauffe-eau et chaudières Aerco Modulex 606. Aerco Modulex 606 Technical data Manuel d'utilisatio

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer
  • Page
    / 60
  • Table des matières
  • MARQUE LIVRES
  • Noté. / 5. Basé sur avis des utilisateurs
Vue de la page 0
Instruction
No.
GF-115H
AERCO INTERNATIONAL, Inc., Northvale, New Jersey, 07647 USA
Installation, Operation
& Maintenance Instructions
Gas Fired
Boiler Systems
Modular, Condensing, Hot Water Boilers
Models: 303, 454, 606, 757, 909, 1060
Printed in U.S.A. 7/17/08
Vue de la page 0
1 2 3 4 5 6 ... 59 60

Résumé du contenu

Page 1 - Boiler Systems

Instruction No. GF-115H AERCO INTERNATIONAL, Inc., Northvale, New Jersey, 07647 USA Installation, Operation & Maint

Page 2 - Telephone Support

INSTALLATION, OPERATION & MAINTENANCE 1-2 1.2 - CODE AND STANDARDS APPROVALS MODULEX has been reviewed for compliance with the applicable section

Page 3 - TABLE OF CONTENTS

INSTALLATION, OPERATION & MAINTENANCE 1-3 1.4 DIMENSIONS AND WEIGHTS The dimensions and weights for each Modulex Model are shown in sheets 1 an

Page 4 - - Continued

INSTALLATION, OPERATION & MA 1-4 INTENANCE Figure 1-1. Modulex Dimensions and Weights (Sheet 2 of 2)

Page 5 - SAFETY SYMBOLS

INSTALLATION, OPERATION & MAINTENANCE 1-5 1.5 - TECHNICAL DATA (THE NAME PLATE IS PLACED UNDER THE FRONT JACKET NEXT TO THE CONTROL PANEL.) M

Page 6

INSTALLATION, OPERATION & MAINTENANCE 1-6 SPECIFICATIONS: (continued) Model Number MLX-303 MLX-454 MLX-606 MLX-757 MLX-909 MLX-1060Water Press

Page 7 - FOR YOUR SAFETY

INSTALLATION, OPERATION & MAINTENANCE 1-7 FANGAS VALVEBURNERCOVERIGNITIONFLAME DETECTORLOCAL NTCSENSORH.L.THERMOSTATBURNERFILLING-UPELBOWGAS PIPE

Page 9 - GENERAL DESCRIPTION

INSTALLATION, OPERATION & MAINTENANCE 2-1 INSTRUCTIONS FOR INSTALLERS 2.1 INTRODUCTION The Modulex Boiler is intended to be installed as a

Page 10

INSTALLATION, OPERATION & MAINTENANCE 2-2 Packed inside the boiler packing you will find: • Painted steel panels: • The front one connected to

Page 11 - 1.4 DIMENSIONS AND WEIGHTS

INSTALLATION, OPERATION & MAINTENANCE 2-3 2.2.2 Locating the Boiler The boiler should be located on a level, solid area or base as near to the

Page 12 - INTENANCE

Telephone Support Direct to AERCO Technical Support (8 to 5 pm EST, Mon. – Fri.) 1-800- 526-0288

Page 13 - SPECIFICATIONS:

INSTALLATION, OPERATION & MAINTENANCE 2-4 2.2.4 Boiler Connections Upon delivery, the Modulex Boiler has all the connections on its R.H. side (

Page 14 - SPECIFICATIONS: (continued)

INSTALLATION, OPERATION & MAINTENANCE 2-5 AUTOMATIC AIR VENTBCM TEMPSENSORE8 TEMPSENSORRETURNTEMPSENSORBOILERDRAINBRACKETSCREWSENSORBRACKETSENSO

Page 15 - 5.9" [150 mm]

INSTALLATION, OPERATION & MAI2-6 NTENANCE FRONT VIEW – R.H. 3. Disassemble the flow (supply) and return manifolds (Figure 2-5), leaving the rubb

Page 16

INSTALLATION, OPERATION & MAINTENANCE 2-7 AUTOMATIC AIR VENTBCM TEMPSENSORE8 TEMPSENSORRETURNTEMPSENSORBOILERDRAINBRACKETSCREWSENSORBRACKET

Page 17 - INSTRUCTIONS FOR INSTALLERS

INSTALLATION, OPERATION & MAINTENANCE 2-8 6. For the gas connection, it is possible to keep the gas manifold inlet on the R.H. side, if desired

Page 18 - Packaged Modulex Boiler

INSTALLATION, OPERATION & MAINTENANCE 2-9 Figure 2-7 Sample Data Plate

Page 19

INSTALLATION, OPERATION & MAINTENANCE 2-10 Table 2-1. Modulex Data Plate Entries MODEL NUMBER MLX-303 MLX-454 MLX-606 MLX-757 MLX-909 MLX-1

Page 20 - 2.2.4 Boiler Connections

INSTALLATION, OPERATION & MAINTENANCE 3-1 GENERAL INFORMATION FOR VENTING Note: See Venting Guide GF-115-V for venting specifications and mate

Page 21 - E8 SENSOR

INSTALLATION, OPERATION & MAINTENANCE 3-2 Pipe lengths and fittings must be calculated as part of the equivalent length. The pressure drop of t

Page 22 - NTENANCE

4-1 4 PIPING NOTE: For in depth piping information for the boiler, see Piping Guide GF-115-P-H 4.1 MAKEUP WATER QUALITY Water at t

Page 23

INSTALLATION, OPERATION & MAINTENANCE i TABLE OF CONTENTS Chapter/Paragraph Page SAFETY SYMBOLS AND WARNINGS iii IMPORTANT iii

Page 24

INSTALLATION, OPERATION & MAINTENANCE 4-2 4.6 SYSTEM FILLING & DRAINING • For filling-up the system a filling tap has to be inserted on

Page 25 - Sample Data Plate

INSTALLATION, OPERATION & MAINTENANCE 5-1 5 ELECTRICAL NOTE: For additional electrical information, see Electrical Power Guide GF-1

Page 26

INSTALLATION, OPERATION & MAINTENANCE 5-2 5. It is necessary to install a double-pole switch on the supply line in an easily accessible position

Page 27

INSTALLATION, OPERATION & MAINTENANCE 5-3 Figure 5-2.

Page 29 - PIPING

INSTALLATION, OPERATION & MAINTENANCE 6-1 6 BOILER OPERATION 6.1 GENERAL DESCRIPTION AND OPERATION The Modulex is a cast aluminum body bo

Page 30 - Figure 4-1

INSTALLATION, OPERATION & MAINTENANCE 6-2 6.3 IGNITION SEQUENCE The ignition sequence is described below and shown in the following diagram (Fi

Page 31 - ELECTRICAL

INSTALLATION, OPERATION & MAINTENANCE 6-3 The outside air sensor, supplied with the boiler, should be mounted on an outer North or Northeast, wal

Page 32

INSTALLATION, OPERATION & MAINTENANCE 6-4 6.5.1 Tools and Instrumentation Required For Combustion Calibration The following tools and instrumen

Page 33 - Figure 5-2

INSTALLATION, OPERATION & MAINTENANCE 6-5 6.5.3 Preparing The Flue For Use With The Combustion Analyzer In order to provide an opening for the

Page 34

INSTALLATION, OPERATION & MAINTENANCE ii TABLE OF CONTENTS - Continued Chapter/Paragraph Page 4.8 GAS MAINS AND CONNECTION 4-3 5 ELECTR

Page 35 - BOILER OPERATION

INSTALLATION, OPERATION & MAINTENANCE 6-6 NOTE The CASCADE MANU (Cascade Manual) mode will time out after a period of 15 minutes. When this occur

Page 36

INSTALLATION, OPERATION & MAINTENANCE 6-7 CAP SCREW / OFFSET ADJUSTMENT OUTLET OUTLET PRESSURE TAP (NORMAL MANIFOLD PRESSURE) Figure 6-2. G

Page 37

INSTALLATION, OPERATION & MAINTENANCE 6-8 NOTE The CASCADE MANU (Cascade Manual) mode will time out after a period of 15 minutes. When this occur

Page 38

INSTALLATION, OPERATION & MAINTENANCE 6-9 6.6 UNIT REASSEMBLY Once the combustion calibration procedures have been completed for each Boiler st

Page 40

INSTALLATION, OPERATION & MAINTENANCE 7-1 MAINTENANCE 7.1 - MAIN FEATURES If the boiler is correctly adjusted, it needs very little mainten

Page 41

INSTALLATION, OPERATION & MAINTENANCE 7-2 7. Remove the “E” screws on the two sides of the burner manifold. 8. Remove the sheet me

Page 42

INSTALLATION, OPERATION & MAINTENANCE 7-3 10. Lift up the fan group “L” by rotating it on the gas manifold axis and keep it up by inserting the

Page 43

INSTALLATION, OPERATION & MAINTENANCE 7-4 12. If you want to remove the baffle from the tray, rotate it within the tray before starting to rem

Page 44

INSTALLATION, OPERATION & MAINTENANCE 7-5 INSTRUCTIONS FOR BURNER REMOVAL WITH REAR GROUND TAB Warning. Remove the burners as shown in the il

Page 45 - MAINTENANCE

INSTALLATION, OPERATION & MAINTENANCE iii SAFETY SYMBOLS The following defined symbols are used throughout this manual to notify the reader of po

Page 46

INSTALLATION, OPERATION & MAINTENANCE 7-6 Table 7-1. Annual Maintenance Schedule TASK RECOMMENDED REQUIRED Inspect air filters X Inspec

Page 47

APPENDIX A A-1 APPENDIX A Temperature Sensor Resistance Charts

Page 48

APPENDIX A A-2 TEMPERATURE SENSOR RESISTANCE CHART TEMPERATURE °F (°C) RESISTANCE (OHMS) -76 (-60) 698961 -58 (-50) 33908 -40 (-40) 16

Page 49 - Warning

APPENDIX B B-1 APPENDIX B Modulex Parts List

Page 51 - APPENDIX A

APPENDIX B B-3

Page 52

APPENDIX B B-4

Page 53 - APPENDIX B

APPENDIX B 1ITEM2QTYPART NO. DESCRIPTION437653/4" STREET ELL 90 B/ISEE TABLE 2GAGE, PRESS/TEMPAQUASTAT, 100°F TO 200°F9-3201SEE TABLE 1SEE TA

Page 55

NOTES: __________________________________________________________________________________________________________________________________________

Page 56

INSTALLATION, OPERATION & MAINTENANCE iv WARNINGS CONTINUED • This INSTRUCTION MANUAL is an integral and indispensable part of the product. I

Page 57 - FRONT VIEW

AERCO INTERNATIONAL INC. 159 PARIS AVENUE, NORTHVALE, N.J. 07647 PHONE 201-768-2400 FAX 201 784-8073 AERCO declines every respons

Page 58

INSTALLATION, OPERATION & MAINTENANCE - v - FOR YOUR SAFETY For boilers that use gaseous fuel, what to do if you smell gas. • Do not try to li

Page 59

INSTALLATION, OPERATION & MAINTENANCE vi Extracted Information From 248 CMR 5.08 (2) – Continued a. In the event that the side wall horizontally

Page 60

INSTALLATION, OPERATION & MAINTENANCE 1-1 1 GENERAL DESCRIPTION IMPORTANT Each AERCO Modulex Boiler is shipped as either a Natural Gas Only Bo

Commentaires sur ces manuels

Pas de commentaire